Property profile is based on 12 matched county property records.
Permit records show activity in Frederick County and Howard County. Cross-county footprints are assembled from each county's separate filing system.
| Date | County | Type | Description |
|---|---|---|---|
| Jun 29, 2026 | Howard County | Residential Electrical Addition Alteration Permit | installation of a 10.66kw Roof Mounted solar system with (26) panels at 410 watts each an… |
| Jun 29, 2026 | Howard County | Solar Express (Residential Only) | installation of a 21.32kw Roof Mounted solar system with 52 panels at 410 watts each and … |
| Jun 29, 2026 | Howard County | Residential Electrical Addition Alteration Permit | installation of a 12.3kw Roof Mounted solar system with (30) panels at 410 watts each and… |
| Jun 29, 2026 | Howard County | Solar Express (Residential Only) | installation of a 10.66 kw Roof Mounted solar system with 26 panels at 410 watts each and… |
| Jun 29, 2026 | Howard County | Solar Express (Residential Only) | installation of a 12.3kw Roof Mounted solar system with 20 panels at 410 watts each and 1… |
| Jun 29, 2026 | Howard County | Residential Electrical Addition Alteration Permit | installation of a 21.32kw Roof Mounted solar system with (52) panels at 410 watts each an… |
| Jun 18, 2026 | Howard County | Solar Express (Residential Only) | SFD/INSTALL (34) ROOF-MOUNTED SOLAR PANELS 34 PANELS, EXISTING USE: SFD |
| Jun 18, 2026 | Howard County | Residential Electrical Addition Alteration Permit | SFD/ INSTALL (34) ROOF-MOUNTED SOLAR PANELS |
| Jun 3, 2026 | Howard County | Solar Express (Residential Only) | SFD/INSTALL 15 ROOF-MOUNTED SOLAR PANELS 15 PANELS, EXISTING USE: SFD |
| Jun 3, 2026 | Howard County | Residential Electrical Addition Alteration Permit | SFD/ INSTALL (15) ROOF-MOUNTED SOLAR PANELS |
Contractors working in Frederick County and Howard County see new permits in their service area the week they are filed, with property details attached.
See how it worksSource: county permit records. Updated monthly. Not every filing names a contractor, so these counts are a floor; actual permit activity is usually higher.