Property profile is based on 18 matched county property records.
| Date | County | Type | Description |
|---|---|---|---|
| Jul 10, 2026 | Frederick County | Residential Use Permit (Addition, Alteration, Accessory) for existing dwellings | Temporary removal of all existing 15 (3.975 kW) solar panels and reinstallation per plans… |
| Jun 29, 2026 | Frederick County | Electrical Permit | Remove and replace existing solar inverter with different modelOriginal Solar permit #141… |
| Jun 17, 2026 | Frederick County | Residential Use Permit (Addition, Alteration, Accessory) for existing dwellings | Replacing expired building permit #484208. Temporary removal of all 26 solar panels and r… |
| Jun 15, 2026 | Frederick County | Electrical Permit | Replace defective solar inverter with same and Replacement of expired permit #484419 TEMP… |
| May 21, 2026 | Frederick County | Residential Use Permit (Addition, Alteration, Accessory) for existing dwellings | Temporary removal of all existing (26) solar panels - reinstallation as originally instal… |
| May 21, 2026 | Frederick County | Electrical Permit | Temporary remove and reinstall the existing 26 solar panels with no changes from original… |
| May 20, 2026 | Frederick County | Electrical Permit | Temporary remove and replace existing (18) solar panels.<div>Related Permit #507912 … |
| May 20, 2026 | Frederick County | Electrical Permit | Remove existing solar inverter and replace with same model number solar inverter. License… |
| May 20, 2026 | Frederick County | Electrical Permit | Remove existing solar inverter and replace with new solar inverter of a different model n… |
| May 20, 2026 | Frederick County | Residential Use Permit (Addition, Alteration, Accessory) for existing dwellings | Temporary removal of existing 18 solar panels and reinstallation as originally installed<… |
Contractors working in Frederick County see new permits in their service area the week they are filed, with property details attached.
See how it worksSource: county permit records. Updated monthly. Not every filing names a contractor, so these counts are a floor; actual permit activity is usually higher.