EDGE ENERGY

MHIC Co licensedPlumb/Gas licensedHVACR licensed Active in Howard County
14
Permits on record
Apr 2026
First seen
Jul 2026
Last active
$9.0M
Assessed value worked on, across 12 properties

Trade activity

HVAC 7
Solar 7

Permits by year

2026 14

Properties they work on

1985
Median year built
$698K
Median assessed value
92%
Single-family
92%
Owner-occupied

Property profile is based on 12 matched county property records.

Recent permits

DateCountyTypeDescription
Jul 13, 2026 Howard County Solar Express (Residential Only) Installation of 32 Hyundai 440-watt AC panels (14.08 kW) with integrated micro-inverters …
Jul 1, 2026 Howard County Solar Express (Residential Only) Installation of 24 Hyundai 440-watt AC panels (10.56 kW) with integrated micro-inverters …
Jul 1, 2026 Howard County Solar Express (Residential Only) Installation of 15 Q-Cells 430-watt AC panels (6.45 kW) with integrated micro-inverters o…
Jul 1, 2026 Howard County Solar Express (Residential Only) Installation of 20 Hyundai 440-watt AC panels (8.8 kW) with integrated micro-inverters on…
Jun 26, 2026 Howard County Express Plumbing Permit Replace gas water heater to an electric 80 gallon Navien heat pump water heater
Jun 26, 2026 Howard County Residential HVAC Addition Alteration Permit Replace gas furnace to an electric heat pump for 2 systems AHRI #216558229 - Outdoor Un…
Jun 16, 2026 Howard County Residential HVAC Addition Alteration Permit Replace current attic heat pump with a 3 ton heat pump. No heater kit needed. AHRI #216…
Jun 16, 2026 Howard County Express Plumbing Permit Replace gas water heater to an electric 50 gallon heat pump water heater Model: NWP500-5…
Jun 3, 2026 Howard County Solar Express (Residential Only) Installation of 29 Hyundai 440-watt AC panels (12.76 kW) with integrated micro-inverters …
May 19, 2026 Howard County Residential HVAC Addition Alteration Permit Replace gas furnace with an electric 3 ton Hisense heat pump system AHRI #216558229 - Out…

Contractors working in Howard County see new permits in their service area the week they are filed, with property details attached.

See how it works

Source: county permit records. Updated monthly. Not every filing names a contractor, so these counts are a floor; actual permit activity is usually higher.