Property profile is based on 23 matched county property records.
Permit records show activity in Frederick County and Howard County. Cross-county footprints are assembled from each county's separate filing system.
| Date | County | Type | Description |
|---|---|---|---|
| Jul 17, 2026 | Howard County | Residential Electrical Addition Alteration Permit | SFTH/ INSTALL (18) ROOF-MOUNTED SOLAR PANELS FOR 7.457 KW/ BLDG PERMIT B26002458 |
| Jul 16, 2026 | Howard County | Solar Express (Residential Only) | SFTH/ INSTALL (18) ROOF-MOUNTED SOLAR PANELS FOR 7.47 KW 18 PANELS, EXISTING USE: Townhou… |
| Jul 15, 2026 | Frederick County | Electrical Permit | INSTALL (42) ROOF-MOUNTED SOLAR PANELS FOR 17.43 KW/ BLDG PERMIT 509762/ MASTER ELECTRICI… |
| Jul 15, 2026 | Frederick County | Residential Use Permit (Addition, Alteration, Accessory) for existing dwellings | INSTALL (20) ROOF-MOUNTED SOLAR PANELS FOR 8.30 KW/ MHIC 131322/ 450 FT² |
| Jul 9, 2026 | Howard County | Solar Express (Residential Only) | SFD/INSTALL 15 ROOF-MOUNTED SOLAR PANELS ON SFD FOR 6.225 KW 15 PANELS, EXISTING USE: SFD |
| Jul 9, 2026 | Howard County | Residential Electrical Addition Alteration Permit | SFD/INSTALL 15 ROOF-MOUNTED SOLAR PANELS FOR 6.225KW |
| Jul 6, 2026 | Howard County | Solar Express (Residential Only) | SFD/ INSTALL (24) ROOF-MOUNTED SOLAR PANELS FOR 11.28 KW 24 PANELS, EXISTING USE: SFD |
| Jul 6, 2026 | Howard County | Residential Electrical Addition Alteration Permit | SFD/ INSTALL (24) ROOF-MOUNTED SOLAR PANELS FOR 11.28 KW/ B26002306 |
| Jul 6, 2026 | Frederick County | Residential Use Permit (Addition, Alteration, Accessory) for existing dwellings | INSTALL (42) ROOF-MOUNTED SOLAR PANELS ON SFD FOR 17.43 KW/ 940 FT²/ MHIC 131322 |
| Jul 2, 2026 | Frederick County | Residential Use Permit (Addition, Alteration, Accessory) for existing dwellings | (28) ROOF-MOUNTED SOLAR PANELS ON HOUSE ROOF FOR 12.60 KW/ MHIC 131322 / 630 FT² |
Contractors working in Frederick County and Howard County see new permits in their service area the week they are filed, with property details attached.
See how it worksSource: county permit records. Updated monthly. Not every filing names a contractor, so these counts are a floor; actual permit activity is usually higher.