The basement recreation area is already finished. For this application, I am only finishing the bedroom and bathroom, which together are...
Bathroom installation in addition above garage. Toilet, shower, and pedestal sink are being installed. Drain and waste piping are being r...
Electrical wiring for remodel to include kitchen, dining area, laundry room, smoke detectors, and a few light outlets and switch relocations
| 9300 block of Bitterroot Ter, Frederick | New single family "Treviso", elevation B, 2 story on partia… | |
| 9400 block of Bitterroot Ter, Frederick | New single family "Westport", elevation F, 2 story on parti… | |
| 800 block of Monocacy Crossing Pkwy, Brunswick | New 2 story single family dwelling with (5) bed, (4.5) bath… | |
| 900 block of Catlett Ct, Brunswick | 2 story single family dwelling with 2 car garage, morning r… |
Exact addresses, owner names, mailing addresses, and CSV export are on the full sheet, along with every lead the day it files.