REPLACE 2 FURNACES WITH 2 FURNACES 100K BTU EACH. REPLACE LINE FROM EXISTING METER TO LOCATION OF EXISTING UNITS. LINE TO BE GO UNDERGROUND.
RUN GAS LINE FROM EXISTING TANK TO EXISTING STUB OUT AND THEN TO ONE 80000BTU FURNACE AND ONE 40000 GAS STOVE
REPLACE EXISTING 70K BTU GAS FURNACE
| 7100 block of Shalin Dr, Marriottsville | REPLACE GAS FURNACE | $720K |
| 1100 block of Sassafras Cir, Eldersburg | REPLACE EXISTING 85K BTU GAS FURNACE | $620K |
| 100 block of Clubside Dr, Taneytown | REPLACE GAS FURNACE | $517K |
| 1800 block of Stuller Rd, New Windsor | A NEW RESIDENCE MODULER HOME, 400AMP SERVICE, WIRING FOR TH… | $468K |
| 5600 block of Sykesville Rd, Sykesville | REPLACE GAS FURNACE | $385K |
Exact addresses, owner names, mailing addresses, and CSV export are on the full sheet, along with every lead the day it files.