INSTALL 60 AMP CIRCUIT FOR A WALL MOUNTED EV CHARGER. INSTALL SECOND FEED FOR A FUTURE EV CHARGER.
ELECTRICAL WIRING FOR BASEMENT RENOVATION
REPLACE HEAT PUMP AND AIR HANDLER
| 900 block of Buckhorn Rd, Sykesville | REPLACE HEAT PUMP & AIR HANDLER WITH SAME | $618K |
| 1800 block of Stafford Ct, Sykesville | REPLACE 3 TON HEAT PUMP AND AIR HANDLER | $468K |
| 1600 block of Armistice Way, Marriottsville | REPLACE HEAT PUMP AND AIR HANDLER SYSTEM WITH THE SAME | $464K |
| 3400 block of Salem Bottom Rd, Westminster | INSTALL NEAM-14 50AMP RECEPTACLE FOR EV CHARGER | $386K |
| 2800 block of Christy Dr, Westminster | INSTALL 2 NEW HEAT PUMPS | $325K |
| 2000 block of Rudy Serra Dr, Sykesville | ELECTRICAL WIRING FOR KITCHEN RENOVATION NO CONSTRUCTION | $260K |
| 700 block of Johahn Dr, Westminster | REPLACE 2 TON HEAT PUMP AIR HANDLER 10KW | $233K |
Exact addresses, owner names, mailing addresses, and CSV export are on the full sheet, along with every lead the day it files.