Property profile is based on 4 matched county property records.
| Date | County | Type | Description |
|---|---|---|---|
| Jun 8, 2026 | Howard County | Residential Electrical Addition Alteration Permit | Install one new 60amp, 50amp, and 30amp electrical circuits for new geothermal system. |
| Jun 4, 2026 | Howard County | Residential Electrical Addition Alteration Permit | Geothermal heat pump replacement, install one new 40amp electrical circuit and connect to… |
| Jun 4, 2026 | Howard County | Residential Electrical Addition Alteration Permit | Geothermal heat pump replacement, connect it to the existing electrical circuits |
| Apr 25, 2026 | Howard County | Residential Electrical Addition Alteration Permit | Install two new 60amp, one 40amp, and one 30amp electrical circuit for new geo heat pumps. |
Contractors working in Howard County see new permits in their service area the week they are filed, with property details attached.
See how it worksSource: county permit records. Updated monthly. Not every filing names a contractor, so these counts are a floor; actual permit activity is usually higher.