ELECTRICAL CONNECTIONS LLC

HC Elec State licensed Active in Frederick County and Howard County
9
Permits on record
Apr 2026
First seen
Jul 2026
Last active
$6.1M
Assessed value worked on, across 9 properties

Trade activity

Accessory Structure 6
Electrical 2
Plumbing 1

Permits by year

2026 9

Properties they work on

1987
Median year built
$490K
Median assessed value
67%
Single-family
67%
Owner-occupied

Property profile is based on 9 matched county property records.

Permit records show activity in Frederick County and Howard County. Cross-county footprints are assembled from each county's separate filing system.

Recent permits

DateCountyTypeDescription
Jul 16, 2026 Howard County Residential Electrical Addition Alteration Permit Install ev Charger Inside Garage
Jun 11, 2026 Frederick County Electrical Permit Replace weather head and point of attachment due to stormWO # 777709637
May 26, 2026 Howard County Residential Electrical Addition Alteration Permit Install EV Charger Inside Garage
May 18, 2026 Howard County Residential Electrical Addition Alteration Permit EV Charger Inside Garage
May 14, 2026 Howard County Residential Electrical Addition Alteration Permit 200 amp Panel Replacement with Service Disconnect and Surge Protection
May 12, 2026 Howard County Residential Electrical Addition Alteration Permit Install EV Charger Inside Garage
May 5, 2026 Howard County Residential Electrical Addition Alteration Permit Rough Wiring (4 Switches, 8 Outlets, 1 Smoke Detector and 2 Light Fixtures in Bathroom)
Apr 30, 2026 Howard County Residential Electrical Addition Alteration Permit 200 amp Heavy Up with Emergency Disconnect and Surge Protection; Install ev Charger Insid…
Apr 14, 2026 Frederick County Electrical Permit EV Charger Inside GarageCharging pedestals are not allowed to be constructed in the right…

Contractors working in Frederick County and Howard County see new permits in their service area the week they are filed, with property details attached.

See how it works

Source: county permit records. Updated monthly. Not every filing names a contractor, so these counts are a floor; actual permit activity is usually higher.