Brad Roth

Contractor in Baltimore County

11
Permits observed
Jan 2023
Most recent permit
1
County worked
10
Towns worked

Permits are pulled before work begins and then inspected by the county. A contractor who files them is working inside a system with an inspector in it, which is what unpermitted work avoids.

Observed working in
Timonium, Arbutus, Baltimore and 7 more

Recent work

  • Permit filed
    January 2023 · Baltimore County

    Remove 6 coax, all fiber/dc trunks, fc12/dc2 units. add 3 new fiber trunk, 9 DC trunks, and 3 dc9 units. remove 9 anten…

  • Permit filed
    January 2023 · Baltimore County

    Remove 3 and install 6 antennas on existing utility pole. Height of proposed work is 171'. Mfg instructions & structura…

  • Permit filed
    January 2023 · Baltimore County

    AT&T WILL REMOVE SIX (6) ANTENNAS, TWO (2) FROM EACH SECTOR, ALL DIPLEXERS, THREE (3) RET MOTORS, ONE (1) FROM EACH SEC…

  • Permit filed
    November 2022 · Baltimore County

    Remove nine (9) existing antennas, three (3) from each sector and installing twelve (12) proposed antennas, four (4) at…

  • Permit filed
    November 2022 · Baltimore County

    Add 6 cband antennas stacked 2 per sector in existinig monopole of 114LF height. mfg's instructions & structural engine…

  • Permit filed
    September 2022 · Baltimore County

    Remove all DC/Fiber runs, Remove all DC2s, Add 3 Fiber Trunks, Add 4 DC9s, Add 12 DC Trunks, Remove 9 Antennas, Remove …

  • Permit filed
    September 2022 · Baltimore County

    Remove (6) Antennas, Relocate (2) Antennas, Add (9) new Antennas and related ancillary equipment on ex monopole, 131' i…

  • Permit filed
    September 2022 · Baltimore County

    Remove 3 antennas, remove 3 TMAs, add 6 antennas, remove 6 coax, remove all fiber/DC runs, remove all DC2s, add 3 DC9s,…

  • Permit filed
    August 2022 · Baltimore County

    Remove 3 antennas, 3 TMAs, 6 Diplexors, 1 UMT 850 Cabinet. Install (6) New Cband Antennas (stacked) & 3 Rectifiers per …

  • Permit filed
    July 2022 · Baltimore County

    REMOVE: ALL DC2 UNITES, (6) COAX, ALL FIBER/DC RUNS, AND ADD: (3) DC9s, (9) DC TRUNKS, (3) FIBER TRUNKS, (6) CBAND ANTE…

Towns we observed them working in

TimoniumArbutusBaltimoreLuthervilleMilford MillOwings MillsPikesvilleRosedaleRandallstownTowson

We hold permit records for Anne Arundel County, Baltimore City, Baltimore County, Carroll County, Frederick County, Howard County, Prince George's County, and Washington DC. Work anywhere else is not missing from this contractor's record, it is outside what we cover.

Permits by year

2022 8
2023 3

Our records for this contractor's counties begin January 2021. Years before that are not shown because we hold nothing for them, not because nothing happened.

What this page is, and is not

  • Baltimore County: 11 permits observed, from records beginning January 2021.

This page shows permits we observed in county records. Our observation is not complete: work done before those dates, in counties we do not cover, or on filings that name no contractor does not appear here. A contractor's real work is almost always greater than what we observed, and absence of a permit on this page does not mean the work was not done or not permitted. We currently hold records for Anne Arundel County, Baltimore City, Baltimore County, Carroll County, Frederick County, Howard County, Prince George's County, and Washington DC; see permit coverage for what that includes.

Common questions

Does a permit record mean this contractor is licensed?
County permit records here do not list a license type for this contractor. That does not mean the contractor is unlicensed; not every county publishes license data with its permits.
Why do some contractors show more permits than others?
Counties began publishing at different times and describe contractors differently, so the number reflects what we observed as much as what the contractor did. It is not a ranking.
What should I still ask for?
Proof of insurance, a written contract, and the license number for the trade being performed. A permit record is a starting point, not a substitute for either.