Property profile is based on 9 matched county property records.
Permit records show activity in Frederick County and Howard County. Cross-county footprints are assembled from each county's separate filing system.
| Date | County | Type | Description |
|---|---|---|---|
| Jul 7, 2026 | Howard County | Residential Electrical Miscellaneous Permit | Install 28kw Generator with (2) 150 amp service rated transfer switches |
| Jun 26, 2026 | Howard County | Residential Electrical Miscellaneous Permit | Install 26kw Generator with (2) 200 amp service rated transfer switches |
| Jun 16, 2026 | Howard County | Residential Electrical Addition Alteration Permit | replacement of all switches, dimmers, light fixtures through out house inside and out. re… |
| Jun 16, 2026 | Howard County | Residential Electrical Miscellaneous Permit | Install 26kw Generator with (2) 200 amp service rated transfer switches |
| May 27, 2026 | Howard County | Residential Electrical Miscellaneous Permit | Install 20kw Generator with (1) 200 amp service rated transfer switch |
| May 22, 2026 | Howard County | Residential Electrical Miscellaneous Permit | install 22kw generator with 1 200 amp service rated transfer switch |
| May 11, 2026 | Howard County | Residential Electrical Miscellaneous Permit | Install 18kw Generator with (1) 100 amp ats |
| Apr 28, 2026 | Frederick County | Electrical Permit | Install 26KW Generator with (2) 200 amp service rated transfer switches.w/o # 777283475 |
| Apr 28, 2026 | Howard County | Residential Electrical Miscellaneous Permit | Install 20kw Generator with 1 200 amp service rated transfer switch |
| Apr 2, 2026 | Howard County | Residential Electrical Miscellaneous Permit | Install 26kw Generator with (2) 200 amp service rated transfer switches Bge w/o # 209037… |
Contractors working in Frederick County and Howard County see new permits in their service area the week they are filed, with property details attached.
See how it worksSource: county permit records. Updated monthly. Not every filing names a contractor, so these counts are a floor; actual permit activity is usually higher.